A+ A A- | Site map | Contacts | Български
Home Projects
Home

Water levels

Water levels on the bulgarian section of the Danube river 09.12.2025 г.
Hydrometeorological stations

station kilo­metre water level (cm) discharge (m3/s) 24 hoursdifference (cm) t water(°C)
Novo Selo 833.60 264 4763 -6 7.0
Lom 743.30 338 5034 -15 7.4
Oryahovo 678.00 228 5250 -20 8.4
Nikopol 597.50 294 -20 7.8
Svishtov 554.30 283 5716 -18 7.8
Ruse 495.60 288 5758 -20 7.6
Silistra 375.50 328 6242 -10 7.5

After 7:00 o´clock water levels are shown in grey denoting they were taken the day prior. Once entered by the person on duty, digit colour updates to blue to denote current water level.


Automated gauging stations

station kilo­metre water level [cm] last 6 hours difference t water [°C]
Novo Selo 833.60 259
7.1
Gomotartsi 819.00 142
7.0
Vidin-Kalafat bridge 796.00 307
Oryahovo 678.00 228
9.0
Gorni Vadin 653.60 49
8.7
Bajkal 640.80 77
9.2
Svishtov 554.30 283
9.1
Ruse-Gurgue bridge 488.70 290
Ryahovo 465.40 65
8.4
Malak Preslavets 413.90 138
9.0
Силистра 375.50 312
9.8

Bottlenecks

Reduced dimensions of the fairway in the section of km 374.10 to km. 610.00

Part Date of measurement Scheme Depth
left (dm)
Depth
middle (dm)
Depth
right (dm)
Width (m)
Chaika island, km 387.000 - 385.000 06.12.2025 download 71.8 63.8 53.8 150
Kosui island 2, km 428.000 - 425.000 26.11.2025 download 60.8 66.8 60.8 140
Dunav Most, km 489.000 - 486.000 30.09.2025 download 61.8 59.8 150
Batin island, km 521.000 - 519.000 04.11.2025 download 59.8 66.8 57.8 150
km 530.000 - 527.000 02.12.2025 download 49.3 51.3 49.3 140
Yantra river, km 538.000 - 535.000 04.12.2025 download 56.3 66.3 50.3 150
Vardim island, km 545.000 - 542.000 04.12.2025 download 47.3 51.3 47.3 90
Vardim island, km 547.000 - 544.000 04.12.2025 download 46.3 50.3 48.3 130
Svishtov, km 556.000 - 554.000 02.12.2025 download 46.3 48.3 47.3 90
Belene island, km 565.000 - 563.000 19.11.2025 download 47.3 50.3 46.3 100
G. Byrzina island, km 576.000 - 573.000 03.12.2025 download 46.3 47.3 47.3 130
Somovit, km 609.000 - 607.000 03.12.2025 download 49.3 51.3 48.3 120
To calculate depths for the day, the minimum probes from the last measurement were taken. Since the time of the measurements, the river bed and floating signstation may have undergone changes.

Forecasts

Oryahovo


Nikopol


Svishtov


Ruse


Silistra



Active Storm events

Novo selo

Not aviable active storm events


Lom

Not aviable active storm events


Oryahovo

Not aviable active storm events


Nikopol

Not aviable active storm events


Ruse

Not aviable active storm events


Silistra

видимост от 500 m до 1000 m


RIS index

RIS index(06.03.2024 г.) download from here

The RIS index is a list of location codes (ISRS) with additional information about the objects, such as characteristics (name, fairway, ...), limitations (depth, bridge clearance, transmission line, ...), working hours...

Electronic Navigational Charts

Download electronic navigational charts
for bulgarian river part (km 375 - km 610), date 25.11.2025

Software for visualizing electronic maps, can be downloaded from the website 7Cs(www.sevencs.com) If you have any suggestions or comments about actual charts, please send to e-mail: stoyanov@appd-bg.org


FIS portal

Everything for shipowners in one place.

The FIS portal is the main information portal for the users of the waterway of the Danube river regarding fairway information. The portal provides up-to-date information on water levels, critical sections, ice phenomena, as well as notifications to ship owners. In addition, information on various water object on the river (bridges, locks, ports), contacts of responsible institutions, as well as electronic and paper navigation maps can be found on it. The FIS portal is available at the web address: www.danubeportal.com and is available in English, German, Slovak, Hungarian, Croatian, Serbian, Romanian and Bulgarian.



Last news

Publish on 21.11.2025 г.
70 Years of the Joint Bulgarian–Romanian Commission for the Maintenance and Improvement of the Danub

Joint Bulgarian–Romanian Commission

read more

Publish on 15.10.2025 г.
EAEMDR tests a nature-based solution for low-water periods

EAEMDR tests a nature-based solution for low-water periods

read more

Publish on 14.10.2025 г.
1000 new coastal signs delivered

1000 new coastal signs delivered

read more


The EXECUTIVE AGENCY FOR EXPLORATION AND MAINTENANCE OF THE DANUBE RIVER is the only specialized administration functioning in accordance with domestic and international obligations of the Republic of Bulgaria in terms of servicing, exploring and maintaining the navigational conditions along the river Danube.
As an executive authority body the EAEMDR acts in the interest of society and in accordance with international commitments (obligations) entered into by the Bulgarian state, in compliance with the Belgrade Convention on navigation on the Danube, the Agreement between the governments of the Republic of Bulgaria and Romania regarding fairway maintenance and improvement in the Bulgarian-Romanian section of the Danube dated 13 February 1956, the Memorandum of Understanding on the development of common European transport corridor VII (river Danube), and other international and domestic acts.
The key priorities in the Agency’s operation include ensuring conditions for safe navigation in the Bulgarian section of the Danube, maintenance, modernization and development of transport infrastructure, improvement of management, execution and successful finalization of projects, financed by European Union funds.


© Executive agency for exploration and maintenance of the Danube river [legal information] [accessibility statement]